The “Baskerville” engineers and design team have vast experience of complete installation work. This begins by working with the customer from the inception of the design, to the manufacturing of the equipment through to the installation of the equipment on site.
Complete professional installations from the bottle bank (source) to the autoclave and or equipment.
 |
Typical Installation:
Specialist reinforced bomb blast room
Explosion proof-intrinsically safe for Zoned areas
Remote operation of autoclave outside the cell
Remote introduction of several gases or liquids
Customised Mass flow and control |
|